​Maharashtra: Kasara-Manmad rail expansion to remove ghat bottlenecks 

The Union Cabinet has approved a 131-km Kasara-Manmad rail project that will include India’s second-longest railway tunnel, a 24 km stretch through the ghat section. The project is part of the plan to quadruple the Mumbai-Howrah high-density corridor and separate passenger and freight traffic.

Why this project matters

>> Connects Mumbai to northern and eastern India
>> Removes bottlenecks in steep ghat section
>> Eliminates the need for banker engines
>> Cuts travel time and improves reliability

“This is a complex project involving advanced tunnel engineering and major infrastructure works,” an official said.

What changes after completion

>> No banker engines needed in the Kasara-Igatpuri stretch
>> Faster passenger and freight movement
>> Better access to the Nashik region and pilgrimage sites
>> Improved connectivity to ports, power plants and logistics hubs
“The project will significantly enhance capacity, efficiency and service reliability on this corridor,” a railway spokesperson said.

What are banker engines

Banker engines are railway locomotives used to provide temporary additional power and traction to assist trains in climbing steep gradients.

 

  • Related Posts

    ​Dy CM Sunetra Pawar calls crucial meet at Devgiri ahead of Maha budget session 

    ​ After Sunetra Pawar’s appointment as Maharashtra`s Deputy Chief Minister, the state’s political landscape is witnessing a major shift. Soon after arriving in Mumbai from Baramati, the Deputy CM has…

    ​Vidyavihar car crash: After being critical for 10 days, wife still critical 

    ​ A 33-year-old man succumbed to his injuries on Sunday, ten days after a sport utility vehicle (SUV) allegedly driven by a minor hit his scooter in Mumbai, a police…

    Leave a Reply

    Your email address will not be published. Required fields are marked *